BBL 4158420100 · BIN 4301899 · Queens · Block 15842, Lot 0100

51-15 BEACH CHANNEL DRIVE

Article 320Pathway source: CBL PDF row · CP0_article_320_2024CBL revision date 2026-06-16Open CBL source PDF
Buildings on lot 1
← Buildings

Article 320 · numerical caps & computed exposure

How this is computed
PeriodOccupancyGFACapActualDeltaEst. penaltyStatusMethodology
2024-29-124,800 sqft-1,204.2 tCO2e--
UnresolvedEJ · PEJA fallback
unresolved_occupancy
v1.0
2030-34-124,800 sqft-1,204.2 tCO2e--
UnresolvedEJ · PEJA fallback
unresolved_occupancy
v1.0

Cap = Σ (occupancy_coefficient × gross_floor_area) using DOB LL97 rules; actual GHG is the most recent LL84 filing. Delta is positive when actual exceeds cap. Estimated penalty is DOB's public $268/tCO2e × delta with a 30-day grace applied via penalty_estimate_usd.

LL84 GHG emissions history

Actual tCO2e reported to LL84 by report year. Each bar links to the raw LL84 row identifier under the chart for auditability.

20211,612.4 tCO2e20221,821.3 tCO2e2023-20241,204.2 tCO2e
YearProperty typeGHGProperty GFASite EUISource EUIES scoreSource
2021Senior Living Community1,612.4 tCO2e124,800 sqft229.1304.287x5e-2fxh / 2266601
2022Senior Living Community1,821.3 tCO2e124,800 sqft251.7332.555zyy-y8am / 2266601
2023Residential Care Facility-128,000 sqft---5zyy-y8am / 5281058
2024Senior Living Community1,204.2 tCO2e124,800 sqft128.1214.8465zyy-y8am / 2266601

Enforcement events (all DOB + ECB + OATH data cross-linked to this BBL)

Open on enforcement page →
0 LL97-specific events · 7 building-scoped context events.
DOB violation filed0 LL97 · 4 scoped
ECB summons issued0 LL97 · 2 scoped
Safety context record0 LL97 · 1 scoped
StageEvent dateViolationSeverityStatusPenaltySource
ECB summons issuedbuilding-scoped2026-03-30
Construction
28-201.1 UNLAWFUL ACTS. FAILURE TO COMPLY WITH AN ORDER OF THE COMMISSIONER
ECB #35718822J
CLASS - 1ACTIVE$2,5306bgk-3dad
DOB violation filedbuilding-scoped2026-03-03
C-CONSTRUCTION OTHER OPTIONAL
FTM BLDG IN A CODE COMPLIANT MANNER-HAZ FACADE CONDITIONS WERE FOUND ON EXP4,OBSVD SEVERAL AREAS W/LOOSE,UNSTABLE,DISLODGED,DETACHING BRICKS W/CRACKS & DETERIORATED MORTAR.THESE STRUCT DEFICIENCIES WERE DEEMED TO PRESENT AN IMMED HAZ TO PUBLIC SAFETY.VACATE ALL AREAS ALONG EXP1&ACCESS TO THE PARKING AREAS UNTIL HAZ COND HAVE BEEN REMEDIED
-V-DOB VIOLATION - ACTIVE-3h2n-5cm9
DOB violation filedbuilding-scoped2026-03-03
C-CONSTRUCTION OTHER OPTIONAL
FTM BLDG IN CODE COMPLIANT MANNER-OBSVD UPTO 7 PARAPET WALL SECTIONS BUT NOT LIMITED TOO THAT ARE SLIGHTLY LEANING INWARD TOWARD ROOF DECK DUE TO DETERIORATED MORTAR JOINTS ON EXTERIOR EALL TO THE BLDG. AN ANNUAL PARAPET OBSERVATION REPORT IS REQ'D T/BE COMPL FOR 2025. SUBMIT ANNUAL PARAPET OBSERVATION REPORT FOR 2025 BY 03/17/2026
-V-DOB VIOLATION - ACTIVE-3h2n-5cm9
DOB violation filedbuilding-scoped2026-03-03
C-CONSTRUCTION OTHER OPTIONAL
CORRECTIVE ACTION PLAN REQ'D-OBSVD HAZ COND @ VARIOUS LOCATIONS W/THE FACADE OF THE BLDG.97 AREAS CONSISTING OF LOOSE,UNSTABLE,DISLODGED, DETACHING BRICKS W/CRACKS AND DETERIORATED MORTAR.THESE DEFICIENCIES ARE AT RISK OF FALLING AND/OR COLLAPSE. OWNER TO IMMED RETAIN REG DESIGN PROF TO EVAL ENITE BLDG&SUBMIT A CORRECTIVE ACTION PLAN
-V-DOB VIOLATION - ACTIVE-3h2n-5cm9
ECB summons issuedbuilding-scoped2026-03-03
Construction
28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER
ECB #35718959K
CLASS - 1ACTIVE$2,5306bgk-3dad
Safety context recordbuilding-scoped2024-06-23
FTF-EN-EARCX
-Dismissed-855j-jady
DOB violation filedbuilding-scoped2024-06-23
EARCX-FAILURE TO SUBMIT EER NONE
FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2023)
-V*-DOB VIOLATION - DISMISSED-3h2n-5cm9

Records are the union of DOB Violations (3h2n-5cm9), ECB (6bgk-3dad), Safety Violations (855j-jady), OATH Hearings (jz4z-kudi), and OATH Trials (y3hw-z6bm) that we could link back to this BBL via BIN or address parsing. Events not tagged LL97-specific are shown as building-scoped context. See methodology · enforcement linking.

Fields we cannot show here (internal DOB data not yet public)

Processing lifecycle

DOB's internal BEAM system tracks per-building compliance stages, RCE / decarbonization plans, and mitigation credits. Those fields are not yet published as an open dataset. When DOB releases them, this product will show them here without a schema migration. Until then, the following are known gaps for this building:

  • Assessed penalty (vs theoretical)
    Actual penalty DOB assessed against a building, distinct from the theoretical over-cap exposure computed from LL84 emissions.
    Simulated · internal DOB data not yet public
    Best-effort shadow field: ecb_summons_issued
    Public release status: announced_not_yet_released
  • Audit assignment
    Buildings selected by DOB for LL97 filing audit and the audit stage.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Audit outcome
    Result of an LL97 audit (accepted / correction ordered / penalty referred).
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Extension flag
    Whether a per-building filing was accepted under a filing extension (June 30 grace or BEAM extension to August 29).
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Filing received date
    Timestamp DOB received a per-building LL97 compliance filing.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Good-faith effort application
    Whether an owner has applied for a good-faith effort determination and its status.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Mediated resolution application
    Application for the LL97 mediated resolution process and its outcome.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Notice of deficiency status
    Whether a notice of deficiency has been issued for a building and its current stage.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Per-building filing status
    Filing status for each covered BBL/BIN combination (filed / late / non-filed / exempt) as tracked in DOB's BEAM system.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Pre-OATH correspondence
    DOB correspondence with owners before an OATH matter is opened (notice of deficiency, cure letters).
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • RDP attestation
    Registered Design Professional attestation attached to each per-building compliance filing.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • RECs / offsets claimed
    Renewable Energy Credits and beneficial-use offsets claimed to reduce reported emissions.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • 60-day cure window
    The 60-day cure window state for a building under LL97 enforcement (open / cured / expired).
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
Every number on this page traces back to a Socrata dataset row or a CBL PDF revision. Where DOB does not publish a computable field (pathway, internal BEAM stage, compliance decision), we say so on the record instead of hiding the gap. See methodology.