79-14 ROCKAWAY BEACH BOULEVARD
CP0_article_320_2024CBL revision date 2026-06-16Open CBL source PDFArticle 320 · numerical caps & computed exposure
How this is computed| Period | Occupancy | GFA | Cap | Actual | Delta | Est. penalty | Status | Methodology |
|---|---|---|---|---|---|---|---|---|
| 2024-29 | R-2(high) | 119,695 sqft | 807.9 tCO2e | 448.3 tCO2e | -359.7 | - | Under capEJ · PEJA fallback | v1.0 |
| 2030-34 | R-2(high) | 119,695 sqft | 487.2 tCO2e | 448.3 tCO2e | -38.9 | - | Under capEJ · PEJA fallback | v1.0 |
Cap = Σ (occupancy_coefficient × gross_floor_area) using DOB LL97 rules; actual GHG is the most recent LL84 filing. Delta is positive when actual exceeds cap. Estimated penalty is DOB's public $268/tCO2e × delta with a 30-day grace applied via penalty_estimate_usd.
LL84 GHG emissions history
Actual tCO2e reported to LL84 by report year. Each bar links to the raw LL84 row identifier under the chart for auditability.
| Year | Property type | GHG | Property GFA | Site EUI | Source EUI | ES score | Source |
|---|---|---|---|---|---|---|---|
| 2021 | Multifamily Housing | 434.6 tCO2e | 119,695 sqft | 61.6 | 95.2 | 100 | 7x5e-2fxh / 4672041 |
| 2022 | Multifamily Housing | 503.4 tCO2e | 119,695 sqft | 68.8 | 103.0 | 99 | 5zyy-y8am / 4672041 |
| 2023 | Multifamily Housing | 450 tCO2e | 119,695 sqft | 61.3 | 80.2 | 85 | 5zyy-y8am / 33946687 |
| 2024 | Multifamily Housing | 448.3 tCO2e | 119,695 sqft | 61.1 | 78.3 | 89 | 5zyy-y8am / 33946687 |
Enforcement events (all DOB + ECB + OATH data cross-linked to this BBL)
Open on enforcement page →| Stage | Event date | Violation | Severity | Status | Penalty | Source |
|---|---|---|---|---|---|---|
| ECB summons issuedbuilding-scoped | 2026-06-09 | Construction BC 3301.2,27-1009(A) FAIL TO SAFEGUARD PERS/PROPERTY AFFECTED BY CONSTRUCTION OP ECB #39191793R | CLASS - 2 | ACTIVE | $5,000 | 6bgk-3dad |
| ECB summons issuedbuilding-scoped | 2026-05-11 | Construction BC 3301.9,27-10009(C) FAIL TO PROVIDE/POST SIGN(S) AT JB SITE PURSUANT TO SUBSEC ECB #39553971X | CLASS - 2 | ACTIVE | $1,250 | 6bgk-3dad |
| Safety context recordbuilding-scoped | 2026-03-17 | FTC-AEU-HAZ | - | Active | - | 855j-jady |
| ECB summons issuedbuilding-scoped | 2025-10-31 | Construction BC 3301.9,27-10009(C) FAIL TO PROVIDE/POST SIGN(S) AT JB SITE PURSUANT TO SUBSEC ECB #39546571L | CLASS - 2 | ACTIVE | $1,250 | 6bgk-3dad |
| ECB summons issuedbuilding-scoped | 2025-10-31 | Construction BC 3307.6,27-1021 SIDEWALK SHED DOES NOT MEET CODE SPECIFICATIONS ECB #39546570J | CLASS - 2 | ACTIVE | $2,400 | 6bgk-3dad |
| Safety context recordbuilding-scoped | 2025-10-10 | FTC-VT-CAT1-CO Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction | - | Active | - | 855j-jady |
| ECB summons issuedbuilding-scoped | 2025-05-06 | Construction AC 28-204.4 FAIL TO COMPLY W/COMMISSIONER ORDER TO FILE CERT OF CORRECTION W/DOB ECB #39539900H | CLASS - 2 | ACTIVE | $6,250 | 6bgk-3dad |
| ECB summons issuedbuilding-scoped | 2025-04-04 | Construction BC 3301.2,27-1009(A) FAIL TO SAFEGUARD PERS/PROPERTY AFFECTED BY CONSTRUCTION OP ECB #39143971Y | CLASS - 2 | RESOLVE | $0 | 6bgk-3dad |
| ECB summons issuedbuilding-scoped | 2025-04-04 | Construction 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER ECB #39143910K | CLASS - 2 | ACTIVE | $6,250 | 6bgk-3dad |
| ECB summons issuedbuilding-scoped | 2025-03-07 | Construction 28-105.12.2 WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND/OR APPROV ECB #39537747L | CLASS - 1 | ACTIVE | $25,000 | 6bgk-3dad |
| ECB summons issuedbuilding-scoped | 2025-03-07 | Construction BC 3307.6,27-1021 SIDEWALK SHED DOES NOT MEET CODE SPECIFICATIONS ECB #39537746J | CLASS - 2 | ACTIVE | $2,400 | 6bgk-3dad |
| Safety context recordbuilding-scoped | 2024-10-11 | FTC-VT-CAT1-CO Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction | - | Active | - | 855j-jady |
| Safety context recordbuilding-scoped | 2024-10-11 | FTC-VT-PER-CO Violation Issued-Failure To File 2023 Periodic Inspection Affirmation of Correction | - | Active | - | 855j-jady |
| DOB violation filedbuilding-scoped | 2024-09-12 | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION | - | V*-DOB VIOLATION - DISMISSED | - | 3h2n-5cm9 |
| Safety context recordbuilding-scoped | 2024-09-12 | FTC-AEU-HAZ | - | Dismissed | - | 855j-jady |
| DOB violation filedbuilding-scoped | 2024-08-01 | FISPFCS-FAILURE TO CORRECT SWARMP CONDITIONS (FACADE) FACADE REQUIRED FAILURE TO CORRECT SWARMP CONDITIONS | - | V-DOB VIOLATION - ACTIVE | - | 3h2n-5cm9 |
| Safety context recordbuilding-scoped | 2024-08-01 | FISPFCS FAILURE TO CORRECT SWARMP CONDITIONS | - | Active | - | 855j-jady |
| ECB summons issuedbuilding-scoped | 2024-06-27 | Construction 28-207.2.2 UNLAWFULLY CONTINUED WORK WHILE NOTICE OF A STOP WORK ORDER ECB #39117936J | CLASS - 1 | RESOLVE | $0 | 6bgk-3dad |
| ECB summons issuedbuilding-scoped | 2024-05-09 | Construction 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER ECB #39114040N | CLASS - 3 | RESOLVE | $250 | 6bgk-3dad |
| ECB summons issuedbuilding-scoped | 2024-04-19 | Construction 28-105.12.2 WRK DOESN'T CONFORM TO APPROV DOCS AND/OR APPROV AMENDMENTS ECB #39527821L | CLASS - 2 | ACTIVE | $1,250 | 6bgk-3dad |
| ECB summons issuedbuilding-scoped | 2024-04-19 | Unknown ECB #39527813L | CLASS - 2 | ACTIVE | $2,500 | 6bgk-3dad |
| ECB summons issuedbuilding-scoped | 2024-04-19 | Unknown ECB #39527841Z | CLASS - 2 | RESOLVE | $0 | 6bgk-3dad |
| ECB summons issuedbuilding-scoped | 2024-04-19 | Construction 28-105.12.2 WRK DOESN'T CONFORM TO APPROV DOCS AND/OR APPROV AMENDMENTS ECB #39527818K | CLASS - 2 | ACTIVE | $6,250 | 6bgk-3dad |
| ECB summons issuedbuilding-scoped | 2024-04-19 | Cranes and Derricks BC 3314.1.1 & 27-1050.1 FAILED TO NOTIFY DEPARTMENT/OBTAIN PERMIT PRIOR TO USE/INST. OFF C-HOO ECB #39527812J | CLASS - 2 | ACTIVE | $2,500 | 6bgk-3dad |
| DOB violation filedbuilding-scoped | 2024-04-03 | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION | - | V-DOB VIOLATION - ACTIVE | - | 3h2n-5cm9 |
| Safety context recordbuilding-scoped | 2024-04-03 | FTC-AEU-HAZ | - | Active | - | 855j-jady |
| Safety context recordbuilding-scoped | 2024-02-20 | FISPHAZ CYCLE 9C UNSAFE REPORT FILED | - | Active | - | 855j-jady |
| DOB violation filedbuilding-scoped | 2024-02-20 | FISPHAZ-HAZARDOUS CONDITION (FACADE) FACADE REQUIRED CYCLE 9C UNSAFE REPORT FILED | - | V-DOB VIOLATION - ACTIVE | - | 3h2n-5cm9 |
| ECB summons issuedbuilding-scoped | 2024-01-23 | Construction 28-105.12.2 WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND/OR APPROV ECB #39525014X | CLASS - 1 | ACTIVE | $12,500 | 6bgk-3dad |
Records are the union of DOB Violations (3h2n-5cm9), ECB (6bgk-3dad), Safety Violations (855j-jady), OATH Hearings (jz4z-kudi), and OATH Trials (y3hw-z6bm) that we could link back to this BBL via BIN or address parsing. Events not tagged LL97-specific are shown as building-scoped context. See methodology · enforcement linking.
Fields we cannot show here (internal DOB data not yet public)
Processing lifecycleDOB's internal BEAM system tracks per-building compliance stages, RCE / decarbonization plans, and mitigation credits. Those fields are not yet published as an open dataset. When DOB releases them, this product will show them here without a schema migration. Until then, the following are known gaps for this building:
- Simulated · internal DOB data not yet publicAssessed penalty (vs theoretical)Actual penalty DOB assessed against a building, distinct from the theoretical over-cap exposure computed from LL84 emissions.Best-effort shadow field:
ecb_summons_issuedPublic release status: announced_not_yet_released - Simulated · internal DOB data not yet publicAudit assignmentBuildings selected by DOB for LL97 filing audit and the audit stage.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicAudit outcomeResult of an LL97 audit (accepted / correction ordered / penalty referred).Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicExtension flagWhether a per-building filing was accepted under a filing extension (June 30 grace or BEAM extension to August 29).Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicFiling received dateTimestamp DOB received a per-building LL97 compliance filing.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicGood-faith effort applicationWhether an owner has applied for a good-faith effort determination and its status.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicMediated resolution applicationApplication for the LL97 mediated resolution process and its outcome.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicNotice of deficiency statusWhether a notice of deficiency has been issued for a building and its current stage.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicPer-building filing statusFiling status for each covered BBL/BIN combination (filed / late / non-filed / exempt) as tracked in DOB's BEAM system.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicPre-OATH correspondenceDOB correspondence with owners before an OATH matter is opened (notice of deficiency, cure letters).Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicRDP attestationRegistered Design Professional attestation attached to each per-building compliance filing.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicRECs / offsets claimedRenewable Energy Credits and beneficial-use offsets claimed to reduce reported emissions.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet public60-day cure windowThe 60-day cure window state for a building under LL97 enforcement (open / cured / expired).Public release status: announced_not_yet_released