NYC Prototypes
Skip to main content
BBL 4163500400 · Queens · Block 16350, Lot 0400

217-02 BREEZY POINT BOULEVARD

Article 320Pathway source: CBL PDF row · CP0_article_320_2024CBL revision date 2026-06-16Open CBL source PDF
← Buildings

Article 320 · numerical caps & computed exposure

How this is computed
PeriodOccupancyGFACapActualDeltaEst. penaltyStatusMethodology
2024-29------
Unresolved
no_ll84_row
v1.0
2030-34------
Unresolved
no_ll84_row
v1.0

Cap = Σ (occupancy_coefficient × gross_floor_area) using DOB LL97 rules; actual GHG is the most recent LL84 filing. Delta is positive when actual exceeds cap. Estimated penalty is DOB's public $268/tCO2e × delta with a 30-day grace applied via penalty_estimate_usd.

Enforcement events (all DOB + ECB + OATH data cross-linked to this BBL)

Open on enforcement page →
0 LL97-specific events · 27 building-scoped context events.
DOB violation filed0 LL97 · 11 scoped
ECB summons issued0 LL97 · 9 scoped
Safety context record0 LL97 · 7 scoped
StageEvent dateViolationSeverityStatusPenaltySource
ECB summons issuedbuilding-scoped2026-03-31
Construction
28-105.12.2 WRK DOESN'T CONFORM TO APPROV DOCS AND/OR APPROV AMENDMENTS
ECB #39182636Z
CLASS - 2ACTIVE$1,2806bgk-3dad
ECB summons issuedbuilding-scoped2025-12-04
Construction
BC 3307.7,27-1021(C) JOB SITE FENCE NOT CONSTRUCTED PURSUANT TO SUBSECTION
ECB #39547593R
CLASS - 2ACTIVE$1,0006bgk-3dad
ECB summons issuedbuilding-scoped2025-12-04
Construction
BC 3301.9,27-10009(C) FAIL TO PROVIDE/POST SIGN(S) AT JB SITE PURSUANT TO SUBSEC
ECB #39547595K
CLASS - 2RESOLVE$1,2506bgk-3dad
Safety context recordbuilding-scoped2025-10-10
FTC-VT-CAT1-NJ
Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction
-Active-855j-jady
DOB violation filedbuilding-scoped2025-09-19
IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL
REMEDY: DEMOLISH STRUCTURE AND GRADE SITE
-V-DOB VIOLATION - ACTIVE-3h2n-5cm9
DOB violation filedbuilding-scoped2025-09-12
IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL
REMEDY: SEAL FIRE DAMAGED BUILDING
-V*-DOB VIOLATION - DISMISSED-3h2n-5cm9
DOB violation filedbuilding-scoped2025-09-12
IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL
REMEDY: INSTALL PERIMETER CONSTRUCTION FENCE
-V*-DOB VIOLATION - DISMISSED-3h2n-5cm9
DOB violation filedbuilding-scoped2025-09-11
C-CONSTRUCTION OTHER OPTIONAL
STRUCTURE RENDERED NON COMPLIANT DUE TO FIRE DAMAGE FROM ADJACENT PROPERTY. AT THE TIME OF INSPECTION OBSERVED AT EXPOSURE #2 MINOR NON STRUCTURAL FIRE DAMAGE TO SIDING.
-V-DOB VIOLATION - ACTIVE-3h2n-5cm9
DOB violation filedbuilding-scoped2025-09-11
C-CONSTRUCTION OTHER OPTIONAL
STRUCTURE RENDERED NON COMPLIANT DUE TO FIRE. AT THE TIME OF INSPECTION OBSERVED EXTENSIVE FIRE, WATER AND SOME DAMAGE THROUGHOUT PREMISES. ALSO APPROXIMATELY 25% OF THE ROOF IS MISSING AND ALL WINDOWS MISSING EXPOSING PREMISES TO THE ELEMENTS.
-V-DOB VIOLATION - ACTIVE-3h2n-5cm9
Safety context recordbuilding-scoped2025-08-29
FTF-VT-CAT1-NJ
Violation Issued-Failure To File 2024 Cat1 Test Report
-Active-855j-jady
Safety context recordbuilding-scoped2025-08-29
FTF-VT-CAT1-NJ
Violation Issued-Failure To File 2024 Cat1 Test Report
-Active-855j-jady
Safety context recordbuilding-scoped2025-08-13
FTF-SC-INITL
Report due for structurally compromised property
-Active-855j-jady
DOB violation filedbuilding-scoped2025-04-23
C-CONSTRUCTION OTHER OPTIONAL
FAILURE TO MAINTAIN.PREMISES WAS DAMAGED BY A FIRE WHICH OCCURRED ON 4/19/2025,CAUSNG CHARRNG TO ROOF,ROOF TRUSSES,&PARTIAL WALL@EXP3.ROOF& WALLS OPEN.LOOSE MATERIAL IN DANGER OF PARTIAL COLLAPSE.OWNR TO ENGAGE NYSPE&ENDRSD CNTRCTR TO EVAL THE ENT BLDG&RPAIR UNDR PRMT.FILE FOR PRMTS BY 6/23/25.SGN OFF RPAIRS 8/25
-V-DOB VIOLATION - ACTIVE-3h2n-5cm9
DOB violation filedbuilding-scoped2025-04-23
C-CONSTRUCTION OTHER OPTIONAL
PREMISES WAS DMGD B A FIRE WHICH OCCURRD ON 4/19/25,CAUSING CHARRNG TO ROOF,ROOF TRUSSES&PARTIAL WALL AT EXP3.ROOF&WALLS OPEN LOOSE MATERIAL IN DANGER OF PARTIAL COLLAPSE.OWNR TO IMMED ENGAGE NYSPE&DEMO ENDRSD CNTRCTR TO INSTALL SHORNG@COMPROMISD ROOF TRUSSES,PRTL DEMO OF COMPRMSD ROOF
-V-DOB VIOLATION - ACTIVE-3h2n-5cm9
DOB violation filedbuilding-scoped2025-04-21
C-CONSTRUCTION OTHER OPTIONAL
EMERGENCY WORK ORDER.PREMISES WAS DMGD BY A FIRE WHICH OCCURRD ON 4/19/25,CAUSNG CHARRNG TO ROOF&WALLS@FRONT OF CHURCH.ROOF&WALLS OPEN LOOSE MATERIAL IN DANGER OF FALLING.OWNR TO IMMED ENGAGE NYSPE&ENDRSD CNTRCTR TO INSTALL A TGHTBRD CNSTRCTN FENCE ARND THE PERIMETER OF THE BLDG
-V-DOB VIOLATION - ACTIVE-3h2n-5cm9
DOB violation filedbuilding-scoped2025-04-19
C-CONSTRUCTION OTHER OPTIONAL
STRUCTURE RENDERED NON COMPLIANT DUE TO FIRE. AT EXPOSURE # 3 OF CHURC H HEAVY FIRE, WATER ANDSMOKE DAMAGE
-V-DOB VIOLATION - ACTIVE-3h2n-5cm9
DOB violation filedbuilding-scoped2025-04-19
C-CONSTRUCTION OTHER OPTIONAL
THERE IS HEAVY FIRE, WATER, & SMOKE DAMAGE THROUGHOUT WITH CHARRING OF WALLS AND JOIST WITH PARTIAL COLLAPSE OF ROOF OWNER TO HIRE NYSPE TO SUBMIT REPORT TO ERT INSPECTIONS@BUILDINGS.NYC GOV WITHIN 14DAYS ADDRESSING ALL CONDITIONS WITH PLANS & TIME FRAME FO R COMPLETION
-V-DOB VIOLATION - ACTIVE-3h2n-5cm9
ECB summons issuedbuilding-scoped2025-04-08
Construction
BC 3301.7 (2014 CODE) FAILURE TO MAINTAIN/DISPLAY ON SITE DOCUMENTS REQUIRED BY BC CHAPTER 3
ECB #39538900N
CLASS - 2RESOLVE$1,2806bgk-3dad
ECB summons issuedbuilding-scoped2025-04-08
Unknown
ECB #39538896J
CLASS - 2RESOLVE$2,5306bgk-3dad
ECB summons issuedbuilding-scoped2024-09-25
Construction
28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER
ECB #39125734L
CLASS - 2RESOLVE$06bgk-3dad
Safety context recordbuilding-scoped2024-09-11
FTF-VT-CAT1-NJ
Violation Issued-Failure To File 2023 Cat1 Test Report
-Active-855j-jady
Safety context recordbuilding-scoped2024-09-11
FTF-VT-PER-CO
Violation Issued-Failure To File 2023 Periodic Inspection Report
-Active-855j-jady
Safety context recordbuilding-scoped2024-09-11
FTF-VT-CAT1-CO
Violation Issued-Failure To File 2023 Cat1 Test Report
-Active-855j-jady
ECB summons issuedbuilding-scoped2024-08-15
Construction
28-105.1 WORK WITHOUT A PERMIT
ECB #39531465X
CLASS - 1RESOLVE$2,5006bgk-3dad
ECB summons issuedbuilding-scoped2024-04-19
Construction
28-105.1 WORK WITHOUT A PERMIT
ECB #39112067Y
CLASS - 2RESOLVE$6206bgk-3dad
ECB summons issuedbuilding-scoped2024-01-30
Construction
BC 3307.7,27-1021(C) JOB SITE FENCE NOT CONSTRUCTED PURSUANT TO SUBSECTION
ECB #39525221Z
CLASS - 2RESOLVE$1,0006bgk-3dad
DOB violation filedbuilding-scoped2024-01-29
C-CONSTRUCTION OTHER OPTIONAL
OBSERVED FOUR CONSTRUCTION WORKERS BUILDING DECK APPROXIMATELY 6'X 12' AND 4'X 40' X 27 INCH HIGH WITH THE CONCRETE FOOTINGS POURED FOR FOUNDATION WORK TO SUPPORT THE DECK. NO PERMIT FOR THIS WORK AT THE TIME OF INSPECTION.
-V*-DOB VIOLATION - DISMISSED-3h2n-5cm9

Records are the union of DOB Violations (3h2n-5cm9), ECB (6bgk-3dad), Safety Violations (855j-jady), OATH Hearings (jz4z-kudi), and OATH Trials (y3hw-z6bm) that we could link back to this BBL via BIN or address parsing. Events not tagged LL97-specific are shown as building-scoped context. See methodology · enforcement linking.

Fields we cannot show here (internal DOB data not yet public)

Processing lifecycle

DOB's internal BEAM system tracks per-building compliance stages, RCE / decarbonization plans, and mitigation credits. Those fields are not yet published as an open dataset. When DOB releases them, this product will show them here without a schema migration. Until then, the following are known gaps for this building:

  • Assessed penalty (vs theoretical)
    Actual penalty DOB assessed against a building, distinct from the theoretical over-cap exposure computed from LL84 emissions.
    Simulated · internal DOB data not yet public
    Best-effort shadow field: ecb_summons_issued
    Public release status: announced_not_yet_released
  • Audit assignment
    Buildings selected by DOB for LL97 filing audit and the audit stage.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Audit outcome
    Result of an LL97 audit (accepted / correction ordered / penalty referred).
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Extension flag
    Whether a per-building filing was accepted under a filing extension (June 30 grace or BEAM extension to August 29).
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Filing received date
    Timestamp DOB received a per-building LL97 compliance filing.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Good-faith effort application
    Whether an owner has applied for a good-faith effort determination and its status.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Mediated resolution application
    Application for the LL97 mediated resolution process and its outcome.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Notice of deficiency status
    Whether a notice of deficiency has been issued for a building and its current stage.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Per-building filing status
    Filing status for each covered BBL/BIN combination (filed / late / non-filed / exempt) as tracked in DOB's BEAM system.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Pre-OATH correspondence
    DOB correspondence with owners before an OATH matter is opened (notice of deficiency, cure letters).
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • RDP attestation
    Registered Design Professional attestation attached to each per-building compliance filing.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • RECs / offsets claimed
    Renewable Energy Credits and beneficial-use offsets claimed to reduce reported emissions.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • 60-day cure window
    The 60-day cure window state for a building under LL97 enforcement (open / cured / expired).
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
Every number on this page traces back to a Socrata dataset row or a CBL PDF revision. Where DOB does not publish a computable field (pathway, internal BEAM stage, compliance decision), we say so on the record instead of hiding the gap. See methodology.