217-02 BREEZY POINT BOULEVARD
CP0_article_320_2024CBL revision date 2026-06-16Open CBL source PDFArticle 320 · numerical caps & computed exposure
How this is computed| Period | Occupancy | GFA | Cap | Actual | Delta | Est. penalty | Status | Methodology |
|---|---|---|---|---|---|---|---|---|
| 2024-29 | - | - | - | - | - | - | Unresolved no_ll84_row | v1.0 |
| 2030-34 | - | - | - | - | - | - | Unresolved no_ll84_row | v1.0 |
Cap = Σ (occupancy_coefficient × gross_floor_area) using DOB LL97 rules; actual GHG is the most recent LL84 filing. Delta is positive when actual exceeds cap. Estimated penalty is DOB's public $268/tCO2e × delta with a 30-day grace applied via penalty_estimate_usd.
Enforcement events (all DOB + ECB + OATH data cross-linked to this BBL)
Open on enforcement page →| Stage | Event date | Violation | Severity | Status | Penalty | Source |
|---|---|---|---|---|---|---|
| ECB summons issuedbuilding-scoped | 2026-03-31 | Construction 28-105.12.2 WRK DOESN'T CONFORM TO APPROV DOCS AND/OR APPROV AMENDMENTS ECB #39182636Z | CLASS - 2 | ACTIVE | $1,280 | 6bgk-3dad |
| ECB summons issuedbuilding-scoped | 2025-12-04 | Construction BC 3307.7,27-1021(C) JOB SITE FENCE NOT CONSTRUCTED PURSUANT TO SUBSECTION ECB #39547593R | CLASS - 2 | ACTIVE | $1,000 | 6bgk-3dad |
| ECB summons issuedbuilding-scoped | 2025-12-04 | Construction BC 3301.9,27-10009(C) FAIL TO PROVIDE/POST SIGN(S) AT JB SITE PURSUANT TO SUBSEC ECB #39547595K | CLASS - 2 | RESOLVE | $1,250 | 6bgk-3dad |
| Safety context recordbuilding-scoped | 2025-10-10 | FTC-VT-CAT1-NJ Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction | - | Active | - | 855j-jady |
| DOB violation filedbuilding-scoped | 2025-09-19 | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL REMEDY: DEMOLISH STRUCTURE AND GRADE SITE | - | V-DOB VIOLATION - ACTIVE | - | 3h2n-5cm9 |
| DOB violation filedbuilding-scoped | 2025-09-12 | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL REMEDY: SEAL FIRE DAMAGED BUILDING | - | V*-DOB VIOLATION - DISMISSED | - | 3h2n-5cm9 |
| DOB violation filedbuilding-scoped | 2025-09-12 | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL REMEDY: INSTALL PERIMETER CONSTRUCTION FENCE | - | V*-DOB VIOLATION - DISMISSED | - | 3h2n-5cm9 |
| DOB violation filedbuilding-scoped | 2025-09-11 | C-CONSTRUCTION OTHER OPTIONAL STRUCTURE RENDERED NON COMPLIANT DUE TO FIRE DAMAGE FROM ADJACENT PROPERTY. AT THE TIME OF INSPECTION OBSERVED AT EXPOSURE #2 MINOR NON STRUCTURAL FIRE DAMAGE TO SIDING. | - | V-DOB VIOLATION - ACTIVE | - | 3h2n-5cm9 |
| DOB violation filedbuilding-scoped | 2025-09-11 | C-CONSTRUCTION OTHER OPTIONAL STRUCTURE RENDERED NON COMPLIANT DUE TO FIRE. AT THE TIME OF INSPECTION OBSERVED EXTENSIVE FIRE, WATER AND SOME DAMAGE THROUGHOUT PREMISES. ALSO APPROXIMATELY 25% OF THE ROOF IS MISSING AND ALL WINDOWS MISSING EXPOSING PREMISES TO THE ELEMENTS. | - | V-DOB VIOLATION - ACTIVE | - | 3h2n-5cm9 |
| Safety context recordbuilding-scoped | 2025-08-29 | FTF-VT-CAT1-NJ Violation Issued-Failure To File 2024 Cat1 Test Report | - | Active | - | 855j-jady |
| Safety context recordbuilding-scoped | 2025-08-29 | FTF-VT-CAT1-NJ Violation Issued-Failure To File 2024 Cat1 Test Report | - | Active | - | 855j-jady |
| Safety context recordbuilding-scoped | 2025-08-13 | FTF-SC-INITL Report due for structurally compromised property | - | Active | - | 855j-jady |
| DOB violation filedbuilding-scoped | 2025-04-23 | C-CONSTRUCTION OTHER OPTIONAL FAILURE TO MAINTAIN.PREMISES WAS DAMAGED BY A FIRE WHICH OCCURRED ON 4/19/2025,CAUSNG CHARRNG TO ROOF,ROOF TRUSSES,&PARTIAL WALL@EXP3.ROOF& WALLS OPEN.LOOSE MATERIAL IN DANGER OF PARTIAL COLLAPSE.OWNR TO ENGAGE NYSPE&ENDRSD CNTRCTR TO EVAL THE ENT BLDG&RPAIR UNDR PRMT.FILE FOR PRMTS BY 6/23/25.SGN OFF RPAIRS 8/25 | - | V-DOB VIOLATION - ACTIVE | - | 3h2n-5cm9 |
| DOB violation filedbuilding-scoped | 2025-04-23 | C-CONSTRUCTION OTHER OPTIONAL PREMISES WAS DMGD B A FIRE WHICH OCCURRD ON 4/19/25,CAUSING CHARRNG TO ROOF,ROOF TRUSSES&PARTIAL WALL AT EXP3.ROOF&WALLS OPEN LOOSE MATERIAL IN DANGER OF PARTIAL COLLAPSE.OWNR TO IMMED ENGAGE NYSPE&DEMO ENDRSD CNTRCTR TO INSTALL SHORNG@COMPROMISD ROOF TRUSSES,PRTL DEMO OF COMPRMSD ROOF | - | V-DOB VIOLATION - ACTIVE | - | 3h2n-5cm9 |
| DOB violation filedbuilding-scoped | 2025-04-21 | C-CONSTRUCTION OTHER OPTIONAL EMERGENCY WORK ORDER.PREMISES WAS DMGD BY A FIRE WHICH OCCURRD ON 4/19/25,CAUSNG CHARRNG TO ROOF&WALLS@FRONT OF CHURCH.ROOF&WALLS OPEN LOOSE MATERIAL IN DANGER OF FALLING.OWNR TO IMMED ENGAGE NYSPE&ENDRSD CNTRCTR TO INSTALL A TGHTBRD CNSTRCTN FENCE ARND THE PERIMETER OF THE BLDG | - | V-DOB VIOLATION - ACTIVE | - | 3h2n-5cm9 |
| DOB violation filedbuilding-scoped | 2025-04-19 | C-CONSTRUCTION OTHER OPTIONAL STRUCTURE RENDERED NON COMPLIANT DUE TO FIRE. AT EXPOSURE # 3 OF CHURC H HEAVY FIRE, WATER ANDSMOKE DAMAGE | - | V-DOB VIOLATION - ACTIVE | - | 3h2n-5cm9 |
| DOB violation filedbuilding-scoped | 2025-04-19 | C-CONSTRUCTION OTHER OPTIONAL THERE IS HEAVY FIRE, WATER, & SMOKE DAMAGE THROUGHOUT WITH CHARRING OF WALLS AND JOIST WITH PARTIAL COLLAPSE OF ROOF OWNER TO HIRE NYSPE TO SUBMIT REPORT TO ERT INSPECTIONS@BUILDINGS.NYC GOV WITHIN 14DAYS ADDRESSING ALL CONDITIONS WITH PLANS & TIME FRAME FO R COMPLETION | - | V-DOB VIOLATION - ACTIVE | - | 3h2n-5cm9 |
| ECB summons issuedbuilding-scoped | 2025-04-08 | Construction BC 3301.7 (2014 CODE) FAILURE TO MAINTAIN/DISPLAY ON SITE DOCUMENTS REQUIRED BY BC CHAPTER 3 ECB #39538900N | CLASS - 2 | RESOLVE | $1,280 | 6bgk-3dad |
| ECB summons issuedbuilding-scoped | 2025-04-08 | Unknown ECB #39538896J | CLASS - 2 | RESOLVE | $2,530 | 6bgk-3dad |
| ECB summons issuedbuilding-scoped | 2024-09-25 | Construction 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER ECB #39125734L | CLASS - 2 | RESOLVE | $0 | 6bgk-3dad |
| Safety context recordbuilding-scoped | 2024-09-11 | FTF-VT-CAT1-NJ Violation Issued-Failure To File 2023 Cat1 Test Report | - | Active | - | 855j-jady |
| Safety context recordbuilding-scoped | 2024-09-11 | FTF-VT-PER-CO Violation Issued-Failure To File 2023 Periodic Inspection Report | - | Active | - | 855j-jady |
| Safety context recordbuilding-scoped | 2024-09-11 | FTF-VT-CAT1-CO Violation Issued-Failure To File 2023 Cat1 Test Report | - | Active | - | 855j-jady |
| ECB summons issuedbuilding-scoped | 2024-08-15 | Construction 28-105.1 WORK WITHOUT A PERMIT ECB #39531465X | CLASS - 1 | RESOLVE | $2,500 | 6bgk-3dad |
| ECB summons issuedbuilding-scoped | 2024-04-19 | Construction 28-105.1 WORK WITHOUT A PERMIT ECB #39112067Y | CLASS - 2 | RESOLVE | $620 | 6bgk-3dad |
| ECB summons issuedbuilding-scoped | 2024-01-30 | Construction BC 3307.7,27-1021(C) JOB SITE FENCE NOT CONSTRUCTED PURSUANT TO SUBSECTION ECB #39525221Z | CLASS - 2 | RESOLVE | $1,000 | 6bgk-3dad |
| DOB violation filedbuilding-scoped | 2024-01-29 | C-CONSTRUCTION OTHER OPTIONAL OBSERVED FOUR CONSTRUCTION WORKERS BUILDING DECK APPROXIMATELY 6'X 12' AND 4'X 40' X 27 INCH HIGH WITH THE CONCRETE FOOTINGS POURED FOR FOUNDATION WORK TO SUPPORT THE DECK. NO PERMIT FOR THIS WORK AT THE TIME OF INSPECTION. | - | V*-DOB VIOLATION - DISMISSED | - | 3h2n-5cm9 |
Records are the union of DOB Violations (3h2n-5cm9), ECB (6bgk-3dad), Safety Violations (855j-jady), OATH Hearings (jz4z-kudi), and OATH Trials (y3hw-z6bm) that we could link back to this BBL via BIN or address parsing. Events not tagged LL97-specific are shown as building-scoped context. See methodology · enforcement linking.
Fields we cannot show here (internal DOB data not yet public)
Processing lifecycleDOB's internal BEAM system tracks per-building compliance stages, RCE / decarbonization plans, and mitigation credits. Those fields are not yet published as an open dataset. When DOB releases them, this product will show them here without a schema migration. Until then, the following are known gaps for this building:
- Simulated · internal DOB data not yet publicAssessed penalty (vs theoretical)Actual penalty DOB assessed against a building, distinct from the theoretical over-cap exposure computed from LL84 emissions.Best-effort shadow field:
ecb_summons_issuedPublic release status: announced_not_yet_released - Simulated · internal DOB data not yet publicAudit assignmentBuildings selected by DOB for LL97 filing audit and the audit stage.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicAudit outcomeResult of an LL97 audit (accepted / correction ordered / penalty referred).Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicExtension flagWhether a per-building filing was accepted under a filing extension (June 30 grace or BEAM extension to August 29).Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicFiling received dateTimestamp DOB received a per-building LL97 compliance filing.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicGood-faith effort applicationWhether an owner has applied for a good-faith effort determination and its status.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicMediated resolution applicationApplication for the LL97 mediated resolution process and its outcome.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicNotice of deficiency statusWhether a notice of deficiency has been issued for a building and its current stage.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicPer-building filing statusFiling status for each covered BBL/BIN combination (filed / late / non-filed / exempt) as tracked in DOB's BEAM system.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicPre-OATH correspondenceDOB correspondence with owners before an OATH matter is opened (notice of deficiency, cure letters).Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicRDP attestationRegistered Design Professional attestation attached to each per-building compliance filing.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicRECs / offsets claimedRenewable Energy Credits and beneficial-use offsets claimed to reduce reported emissions.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet public60-day cure windowThe 60-day cure window state for a building under LL97 enforcement (open / cured / expired).Public release status: announced_not_yet_released