75 VANDERBILT AVENUE
CP0_article_320_2024CBL revision date 2026-06-16Open CBL source PDFArticle 320 · numerical caps & computed exposure
How this is computed| Period | Occupancy | GFA | Cap | Actual | Delta | Est. penalty | Status | Methodology |
|---|---|---|---|---|---|---|---|---|
| 2024-29 | - | 502,197 sqft | - | 1,754.2 tCO2e | - | - | UnresolvedEJ · PEJA fallback unresolved_occupancy | v1.0 |
| 2030-34 | - | 502,197 sqft | - | 1,754.2 tCO2e | - | - | UnresolvedEJ · PEJA fallback unresolved_occupancy | v1.0 |
Cap = Σ (occupancy_coefficient × gross_floor_area) using DOB LL97 rules; actual GHG is the most recent LL84 filing. Delta is positive when actual exceeds cap. Estimated penalty is DOB's public $268/tCO2e × delta with a 30-day grace applied via penalty_estimate_usd.
LL84 GHG emissions history
Actual tCO2e reported to LL84 by report year. Each bar links to the raw LL84 row identifier under the chart for auditability.
| Year | Property type | GHG | Property GFA | Site EUI | Source EUI | ES score | Source |
|---|---|---|---|---|---|---|---|
| 2021 | Residential Care Facility | 1,478.4 tCO2e | 502,197 sqft | 42.7 | 102.0 | - | 7x5e-2fxh / 7871306 |
| 2022 | Residential Care Facility | 1,502.6 tCO2e | 502,197 sqft | 37.5 | 95.1 | - | 5zyy-y8am / 7871306 |
| 2023 | Residential Care Facility | 1,679.9 tCO2e | 502,197 sqft | 33.2 | 84.6 | - | 5zyy-y8am / 7871306 |
| 2024 | Residential Care Facility | 1,754.2 tCO2e | 502,197 sqft | 32.7 | 83.9 | - | 5zyy-y8am / 7871306 |
Enforcement events (all DOB + ECB + OATH data cross-linked to this BBL)
Open on enforcement page →| Stage | Event date | Violation | Severity | Status | Penalty | Source |
|---|---|---|---|---|---|---|
| Safety context recordbuilding-scoped | 2026-01-08 | FTF-PL-PER Cycle 2, Sub-cycle A (premises is in Community District 1) | - | Active | - | 855j-jady |
| Safety context recordbuilding-scoped | 2026-01-08 | FTF-PL-PER Cycle 2, Sub-cycle A (premises is in Community District 1) | - | Active | - | 855j-jady |
| DOB violation filedbuilding-scoped | 2025-11-14 | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | - | V-DOB VIOLATION - ACTIVE | - | 3h2n-5cm9 |
| DOB violation filedbuilding-scoped | 2025-11-14 | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | - | V-DOB VIOLATION - ACTIVE | - | 3h2n-5cm9 |
| Safety context recordbuilding-scoped | 2025-11-14 | LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | - | Active | - | 855j-jady |
| Safety context recordbuilding-scoped | 2025-11-14 | LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | - | Active | - | 855j-jady |
| Safety context recordbuilding-scoped | 2025-10-10 | FTC-VT-CAT1-CO Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction | - | Active | - | 855j-jady |
| Safety context recordbuilding-scoped | 2025-10-10 | FTC-VT-PER-CO Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction | - | Active | - | 855j-jady |
| Safety context recordbuilding-scoped | 2025-08-29 | FTF-VT-CAT1-CO Violation Issued-Failure To File 2024 Cat1 Test Report | - | Active | - | 855j-jady |
| Safety context recordbuilding-scoped | 2025-08-29 | FTF-VT-PER-CO Violation Issued-Failure To File 2024 Periodic Inspection Report | - | Active | - | 855j-jady |
| ECB summons issuedbuilding-scoped | 2025-06-16 | Unknown ECB #39541461H | CLASS - 2 | RESOLVE | $2,530 | 6bgk-3dad |
| DOB violation filedbuilding-scoped | 2024-11-08 | C-CONSTRUCTION OTHER OPTIONAL FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER.EXPS 1,2,3&4 SPALLED SPALLING MASONRY DECORATIVE TERRA COTTA @ PARAPET LEVEL & CRACKS OF MASONRY BRICK FACADE. @ EXP2,3&4 (WEST,NORTH&EAST ELEVATIONS) DETERIORATED MORTAR JOINTS WERE OBSERVED. ALSO AT EXP1 (SOUTH ELEV) BROKEN WIND GLASS. REMEDY: REPAIR AND/OR REPLACE | - | V-DOB VIOLATION - ACTIVE | - | 3h2n-5cm9 |
| ECB summons issuedbuilding-scoped | 2024-11-08 | Construction BC 3307.6,27-1021 SIDEWALK SHED DOES NOT MEET CODE SPECIFICATIONS ECB #35686961X | CLASS - 2 | ACTIVE | $2,400 | 6bgk-3dad |
| ECB summons issuedbuilding-scoped | 2024-11-08 | Construction BC 105.8.2 TEMPORARY CONSTRUCTION EQUIPMENT ON SITE-EXPIRED PERMIT ECB #35686956L | CLASS - 2 | RESOLVE | $0 | 6bgk-3dad |
| DOB violation filedbuilding-scoped | 2024-10-29 | EGNCY-EMERGENCY NONE FULLY DEMOLISH BUILDING, GRADE & FENCE SITE. COORDINATE DEMO OPS WITH FDNY BATTALION 21 AT 347-539-0521 & BAT021@FDNY.NYC.GOV | - | V-DOB VIOLATION - ACTIVE | - | 3h2n-5cm9 |
| DOB violation filedbuilding-scoped | 2024-10-24 | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL ERECT 530 FT OF TIGHT BOARD CONSTRUCTION FENCE AS FOLLOWS; EXP1 150FT, EXP2 115FT, EXP3 150FT, EXP4 115FT | - | V*-DOB VIOLATION - DISMISSED | - | 3h2n-5cm9 |
| DOB violation filedbuilding-scoped | 2024-10-21 | C-CONSTRUCTION OTHER OPTIONAL PREMISE NON-COMPLIANT BUILDING 5A: DUE TO A FIRE AND FIRE FIGHTING OPERATIONS. THE ROOF IS COLLAPSED. THE WALLS,DOORS,WINDOWS,CEILINGS,FLOORS ARE DAMAGED THRU-OUT AT TIME OF INSPECTION. | - | V-DOB VIOLATION - ACTIVE | - | 3h2n-5cm9 |
| DOB violation filedbuilding-scoped | 2024-10-21 | C-CONSTRUCTION OTHER OPTIONAL STRUCTURE NON COMPLIANT DAMAGES OBSERVED ARE DUE TO A FIRE. STRUCTURE HAS A COLLAPSED ROOF WITH WINDOWS & DOORS REMOVED . THE CEILINGS ARE O PEN , THESE CONDITIONS RENDER PREMISES UNSAFE TO OCCUPY . VACATE FORWI TH | - | V-DOB VIOLATION - ACTIVE | - | 3h2n-5cm9 |
| Safety context recordbuilding-scoped | 2024-10-11 | FTC-VT-CAT1-CO Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction | - | Active | - | 855j-jady |
| Safety context recordbuilding-scoped | 2024-10-11 | FTC-VT-CAT1-CO Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction | - | Active | - | 855j-jady |
| Safety context recordbuilding-scoped | 2024-10-11 | FTC-VT-CAT1-CO Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction | - | Active | - | 855j-jady |
| DOB violation filedbuilding-scoped | 2024-09-23 | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION | - | V-DOB VIOLATION - ACTIVE | - | 3h2n-5cm9 |
| Safety context recordbuilding-scoped | 2024-09-23 | LBLVIO Violation Issued-Failure To File 2023 External Low Pressure Inspection Report | - | Active | - | 855j-jady |
| Safety context recordbuilding-scoped | 2024-09-23 | LBLVIO Violation Issued-Failure To File 2023 External Low Pressure Inspection Report | - | Active | - | 855j-jady |
| DOB violation filedbuilding-scoped | 2024-09-23 | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION | - | V-DOB VIOLATION - ACTIVE | - | 3h2n-5cm9 |
| DOB violation filedbuilding-scoped | 2024-09-18 | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION | - | V-DOB VIOLATION - ACTIVE | - | 3h2n-5cm9 |
| Safety context recordbuilding-scoped | 2024-09-18 | FTC-AEU-HAZ | - | Active | - | 855j-jady |
| Safety context recordbuilding-scoped | 2024-09-11 | FTF-VT-CAT1-CO Violation Issued-Failure To File 2023 Cat1 Test Report | - | Active | - | 855j-jady |
| Safety context recordbuilding-scoped | 2024-09-11 | FTF-VT-PER-CO Violation Issued-Failure To File 2023 Periodic Inspection Report | - | Active | - | 855j-jady |
| ECB summons issuedbuilding-scoped | 2024-06-28 | Construction 28-302.1 FAILURE TO MAINTAIN BLDG WALL(S) OR APPURTENANCES ECB #35664066M | CLASS - 1 | ACTIVE | $2,500 | 6bgk-3dad |
| ECB summons issuedbuilding-scoped | 2024-06-28 | Unknown ECB #35664068X | CLASS - 2 | RESOLVE | $1,250 | 6bgk-3dad |
| ECB summons issuedbuilding-scoped | 2024-06-28 | Construction BC 3307.6,27-1021 SIDEWALK SHED DOES NOT MEET CODE SPECIFICATIONS ECB #35664067Y | CLASS - 2 | ACTIVE | $2,400 | 6bgk-3dad |
| DOB violation filedbuilding-scoped | 2024-06-23 | EARCX-FAILURE TO SUBMIT EER NONE FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2023) | - | V-DOB VIOLATION - ACTIVE | - | 3h2n-5cm9 |
| Safety context recordbuilding-scoped | 2024-06-23 | FTF-EN-EARCX | - | Active | - | 855j-jady |
| DOB violation filedbuilding-scoped | 2024-02-09 | C-CONSTRUCTION OTHER OPTIONAL FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER. OBSERVED CRACKED BRICKWORK. BROKEN GLASS WINDOWS, DETERIORATING STONE ALL IN MULTIPLE LOCATIONS. REMEDY: FIX AND OR REPLACE | - | V-DOB VIOLATION - ACTIVE | - | 3h2n-5cm9 |
| ECB summons issuedbuilding-scoped | 2024-02-09 | Construction BC 3307.6,27-1021 SIDEWALK SHED DOES NOT MEET CODE SPECIFICATIONS ECB #35675261L | CLASS - 2 | RESOLVE | $2,400 | 6bgk-3dad |
| ECB summons issuedbuilding-scoped | 2024-02-09 | Construction 28-201.1 UNLAWFUL ACTS. FAILURE TO COMPLY WITH AN ORDER OF THE COMMISSIONER ECB #35675469K | CLASS - 1 | ACTIVE | $2,500 | 6bgk-3dad |
Records are the union of DOB Violations (3h2n-5cm9), ECB (6bgk-3dad), Safety Violations (855j-jady), OATH Hearings (jz4z-kudi), and OATH Trials (y3hw-z6bm) that we could link back to this BBL via BIN or address parsing. Events not tagged LL97-specific are shown as building-scoped context. See methodology · enforcement linking.
Data quality flags
- temporary_value_reportedSee methodology for the exact definition of this flag; behavior may vary by pathway or period.
Full flag catalog: methodology · data quality flags
Fields we cannot show here (internal DOB data not yet public)
Processing lifecycleDOB's internal BEAM system tracks per-building compliance stages, RCE / decarbonization plans, and mitigation credits. Those fields are not yet published as an open dataset. When DOB releases them, this product will show them here without a schema migration. Until then, the following are known gaps for this building:
- Simulated · internal DOB data not yet publicAssessed penalty (vs theoretical)Actual penalty DOB assessed against a building, distinct from the theoretical over-cap exposure computed from LL84 emissions.Best-effort shadow field:
ecb_summons_issuedPublic release status: announced_not_yet_released - Simulated · internal DOB data not yet publicAudit assignmentBuildings selected by DOB for LL97 filing audit and the audit stage.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicAudit outcomeResult of an LL97 audit (accepted / correction ordered / penalty referred).Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicExtension flagWhether a per-building filing was accepted under a filing extension (June 30 grace or BEAM extension to August 29).Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicFiling received dateTimestamp DOB received a per-building LL97 compliance filing.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicGood-faith effort applicationWhether an owner has applied for a good-faith effort determination and its status.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicMediated resolution applicationApplication for the LL97 mediated resolution process and its outcome.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicNotice of deficiency statusWhether a notice of deficiency has been issued for a building and its current stage.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicPer-building filing statusFiling status for each covered BBL/BIN combination (filed / late / non-filed / exempt) as tracked in DOB's BEAM system.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicPre-OATH correspondenceDOB correspondence with owners before an OATH matter is opened (notice of deficiency, cure letters).Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicRDP attestationRegistered Design Professional attestation attached to each per-building compliance filing.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicRECs / offsets claimedRenewable Energy Credits and beneficial-use offsets claimed to reduce reported emissions.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet public60-day cure windowThe 60-day cure window state for a building under LL97 enforcement (open / cured / expired).Public release status: announced_not_yet_released