NYC Prototypes
Skip to main content
BBL 5028200110 · BIN 5042097 · Staten Island · Block 02820, Lot 0110

181 EDGEWATER STREET

Article 320Pathway source: CBL PDF row · CP0_article_320_2024CBL revision date 2026-06-16Open CBL source PDF
Buildings on lot 1
← Buildings

Article 320 · numerical caps & computed exposure

How this is computed
PeriodOccupancyGFACapActualDeltaEst. penaltyStatusMethodology
2024-29------
Unresolved
no_ll84_row
v1.0
2030-34------
Unresolved
no_ll84_row
v1.0

Cap = Σ (occupancy_coefficient × gross_floor_area) using DOB LL97 rules; actual GHG is the most recent LL84 filing. Delta is positive when actual exceeds cap. Estimated penalty is DOB's public $268/tCO2e × delta with a 30-day grace applied via penalty_estimate_usd.

Enforcement events (all DOB + ECB + OATH data cross-linked to this BBL)

Open on enforcement page →
0 LL97-specific events · 25 building-scoped context events.
DOB violation filed0 LL97 · 8 scoped
ECB summons issued0 LL97 · 6 scoped
Safety context record0 LL97 · 11 scoped
StageEvent dateViolationSeverityStatusPenaltySource
Safety context recordbuilding-scoped2026-06-22
FTF-EN-BENCH
FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
-Active-855j-jady
Safety context recordbuilding-scoped2026-04-20
FTF-EN-LL97320
-Active-855j-jady
ECB summons issuedbuilding-scoped2026-04-10
Construction
28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER
ECB #39184060Y
CLASS - 1ACTIVE$6,2806bgk-3dad
ECB summons issuedbuilding-scoped2026-04-10
Construction
28-201.1 UNLAWFUL ACTS. FAILURE TO COMPLY WITH AN ORDER OF THE COMMISSIONER
ECB #39184055J
CLASS - 1ACTIVE$2,5306bgk-3dad
Safety context recordbuilding-scoped2026-03-06
FTF-EN-BENCH
FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
-Active-855j-jady
Safety context recordbuilding-scoped2026-01-08
FTF-PL-PER
Cycle 2, Sub-cycle A (premises is in Community District 1)
-Active-855j-jady
Safety context recordbuilding-scoped2025-12-03
FTF-EN-BENCH
FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
-Active-855j-jady
Safety context recordbuilding-scoped2025-09-26
FTF-EN-BENCH
FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
-Active-855j-jady
DOB violation filedbuilding-scoped2025-05-06
C-CONSTRUCTION OTHER OPTIONAL
EMERGENCY WORK ORDER.AT TIME OF INSPECTION,OBSRVD BLDG TO BE IN A STATE OF DISREPAIR W/METAL FACADE PANELS IMPROPERLY SEVERED & IN DANGER OF CLLPSE,ROOF OVERHANGS PRTLLY CLLPSD W/REMAINING WOOD ROOF COMPLY WITH COMMISSIONER'S ORDER:DOB VIOLATION #030405FEU50102AK (CONTROL #341995) IMMEDIATELY
-V-DOB VIOLATION - ACTIVE-3h2n-5cm9
DOB violation filedbuilding-scoped2025-03-10
C-CONSTRUCTION OTHER OPTIONAL
EMERGENCY WORK ORDER.AT TIME OF INSPECTION,OBSRVD BLDG TO BE IN A STATE OF DISREPAIR W/METAL FACADE PANELS IMPROPERLY SEVERED & IN DANGER OF CLLPSE,ROOF OVERHANGS PRTLLY CLLPSD W/REMAINING WOOD ROOF COMPLY WITH COMMISSIONER'S ORDER:DOB VIOLATION #030405FEU50101AK (CONTROL #341954) IMMEDIATELY
-V-DOB VIOLATION - ACTIVE-3h2n-5cm9
ECB summons issuedbuilding-scoped2025-03-04
Construction
28-201.1 UNLAWFUL ACTS. FAILURE TO COMPLY WITH AN ORDER OF THE COMMISSIONER
ECB #39140258P
CLASS - 1RESOLVE$6,2506bgk-3dad
DOB violation filedbuilding-scoped2025-03-04
C-CONSTRUCTION OTHER OPTIONAL
OBSERVED AT EXP 1 A SECTION OF WOOD/METAL ROOF HAS COLLAPSED AND FALLEN INTO TREE ABOVE EDGEWATER STREET. AT EXP 2 METAL SIDING SHEETS ARE LOOSE AND DETACHING FROM BUILDINGS FACADE. AT EXP 2 BUILDING IS OPEN AND UNGUARDED TO PUBLIC ALLOWING FOR PEDESTRIANS TO ENTER AND POSSIBLY GET HURT.
-V-DOB VIOLATION - ACTIVE-3h2n-5cm9
ECB summons issuedbuilding-scoped2025-03-04
Construction
28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER
ECB #39140272L
CLASS - 1ACTIVE$12,5006bgk-3dad
ECB summons issuedbuilding-scoped2025-03-04
Construction
28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER
ECB #39140336L
CLASS - 1ACTIVE$12,5006bgk-3dad
DOB violation filedbuilding-scoped2025-03-04
C-CONSTRUCTION OTHER OPTIONAL
EMERGENCY WORK ORDER.AT TIME OF INSPECTION,OBSRVD BLDG TO BE IN A STATE OF DISREPAIR W/METAL FACADE PANELS IMPROPERLY SEVERED & IN DANGER OF CLLPSE,ROOF OVERHANGS PRTLLY CLLPSD W/REMAINING WOOD ROOF COMPLY WITH COMMISSIONER'S ORDER:DOB VIOLATION #030425FEU50101AK (CONTROL #341954) IMMEDIATELY
-V-DOB VIOLATION - ACTIVE-3h2n-5cm9
DOB violation filedbuilding-scoped2025-03-04
C-CONSTRUCTION OTHER OPTIONAL
FAILURE TO MAINTAIN.AT TIME OF INSPECTION,OBSRVD BLDG TO BE IN A STATE OF DISREPAIR W/METAL FACADE PANELS IMPROPERLY SEVERED IN DANGR OF CLLPDE,ROOF OVERHANGS PRTLLY CLLPSD W/REMAINING WOOD ROOF.OWNR TO ENGAGE NYSPE&ENDRSD CNTRCTR TO EVAL THE ENT BLDG&RPAIR UNDR PRMT.FILE FOR PRMTS BY 5/5/25.SGN OFF RPAIRS 8/5
-V-DOB VIOLATION - ACTIVE-3h2n-5cm9
Safety context recordbuilding-scoped2025-02-28
FTF-EN-BENCH
FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
-Active-855j-jady
Safety context recordbuilding-scoped2024-12-02
FTF-EN-BENCH
FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
-Active-855j-jady
ECB summons issuedbuilding-scoped2024-12-02
Construction
28-105.1 WORK WITHOUT A PERMIT
ECB #39131656X
CLASS - 1ACTIVE$12,5006bgk-3dad
Safety context recordbuilding-scoped2024-12-01
FTP-EN-EGRDEA
-Active-855j-jady
DOB violation filedbuilding-scoped2024-12-01
EGRADE-FAILURE TO POST ENERGY GRADE/SCORE NONE
FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3
-V-DOB VIOLATION - ACTIVE-3h2n-5cm9
Safety context recordbuilding-scoped2024-08-02
FTF-EN-BENCH
-Active-855j-jady
DOB violation filedbuilding-scoped2024-08-02
BENCH-FAILURE TO BENCHMARK NONE
FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
-V-DOB VIOLATION - ACTIVE-3h2n-5cm9
Safety context recordbuilding-scoped2024-05-02
FTF-EN-BENCH
-Active-855j-jady
DOB violation filedbuilding-scoped2024-05-02
BENCH-FAILURE TO BENCHMARK NONE
FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
-V-DOB VIOLATION - ACTIVE-3h2n-5cm9

Records are the union of DOB Violations (3h2n-5cm9), ECB (6bgk-3dad), Safety Violations (855j-jady), OATH Hearings (jz4z-kudi), and OATH Trials (y3hw-z6bm) that we could link back to this BBL via BIN or address parsing. Events not tagged LL97-specific are shown as building-scoped context. See methodology · enforcement linking.

Fields we cannot show here (internal DOB data not yet public)

Processing lifecycle

DOB's internal BEAM system tracks per-building compliance stages, RCE / decarbonization plans, and mitigation credits. Those fields are not yet published as an open dataset. When DOB releases them, this product will show them here without a schema migration. Until then, the following are known gaps for this building:

  • Assessed penalty (vs theoretical)
    Actual penalty DOB assessed against a building, distinct from the theoretical over-cap exposure computed from LL84 emissions.
    Simulated · internal DOB data not yet public
    Best-effort shadow field: ecb_summons_issued
    Public release status: announced_not_yet_released
  • Audit assignment
    Buildings selected by DOB for LL97 filing audit and the audit stage.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Audit outcome
    Result of an LL97 audit (accepted / correction ordered / penalty referred).
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Extension flag
    Whether a per-building filing was accepted under a filing extension (June 30 grace or BEAM extension to August 29).
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Filing received date
    Timestamp DOB received a per-building LL97 compliance filing.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Good-faith effort application
    Whether an owner has applied for a good-faith effort determination and its status.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Mediated resolution application
    Application for the LL97 mediated resolution process and its outcome.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Notice of deficiency status
    Whether a notice of deficiency has been issued for a building and its current stage.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Per-building filing status
    Filing status for each covered BBL/BIN combination (filed / late / non-filed / exempt) as tracked in DOB's BEAM system.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Pre-OATH correspondence
    DOB correspondence with owners before an OATH matter is opened (notice of deficiency, cure letters).
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • RDP attestation
    Registered Design Professional attestation attached to each per-building compliance filing.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • RECs / offsets claimed
    Renewable Energy Credits and beneficial-use offsets claimed to reduce reported emissions.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • 60-day cure window
    The 60-day cure window state for a building under LL97 enforcement (open / cured / expired).
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
Every number on this page traces back to a Socrata dataset row or a CBL PDF revision. Where DOB does not publish a computable field (pathway, internal BEAM stage, compliance decision), we say so on the record instead of hiding the gap. See methodology.