Article 321Pathway source: CBL PDF row · CP3_article_321_one_timeCBL revision date 2026-06-16Open CBL source PDF
Buildings on lot 3
← Buildings

Article 321 · prescriptive compliance pathway

This building is on the Article 321 pathway. Article 321 does not use a numerical cap; compliance is demonstrated via the prescriptive measures package (per methodology · Article 321), which DOB does not currently publish per building. Cap, delta, and penalty columns are intentionally suppressed on Article 321 rows in this product.

2024-29
Occupancy: R-2
GFA: 108,882 sqft
Methodology: v1.0
2030-34
Occupancy: R-2
GFA: 108,882 sqft
Methodology: v1.0

LL84 GHG emissions history

Actual tCO2e reported to LL84 by report year. Each bar links to the raw LL84 row identifier under the chart for auditability.

20211,817.6 tCO2e20221,871.8 tCO2e20231,864.3 tCO2e2024-
YearProperty typeGHGProperty GFASite EUISource EUIES scoreSource
2021Multifamily Housing1,817.6 tCO2e326,646 sqft97.7134.2387x5e-2fxh / 5998984
2022Multifamily Housing1,871.8 tCO2e326,646 sqft97.3133.4435zyy-y8am / 5998984
2023Multifamily Housing1,864.3 tCO2e326,656 sqft89.7123.9415zyy-y8am / 5998984
2024Multifamily Housing-108,882 sqft---5zyy-y8am / 54343792

Enforcement events (all DOB + ECB + OATH data cross-linked to this BBL)

Open on enforcement page →
0 LL97-specific events · 16 building-scoped context events.
DOB violation filed0 LL97 · 6 scoped
ECB summons issued0 LL97 · 6 scoped
Safety context record0 LL97 · 4 scoped
StageEvent dateViolationSeverityStatusPenaltySource
ECB summons issuedbuilding-scoped2026-06-15
Construction
AC 28-204.4 FAIL TO COMPLY W/COMMISSIONER ORDER TO FILE CERT OF CORRECTION W/DOB
ECB #39192547X
CLASS - 2ACTIVE$1,2506bgk-3dad
ECB summons issuedbuilding-scoped2026-05-11
Elevators
28-301.1 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER: SERVICE EQUIPME
ECB #39188129L
CLASS - 1ACTIVE$1,2506bgk-3dad
Safety context recordbuilding-scoped2025-11-14
LBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
-Active-855j-jady
DOB violation filedbuilding-scoped2025-11-14
LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
-V-DOB VIOLATION - ACTIVE-3h2n-5cm9
ECB summons issuedbuilding-scoped2025-08-30
Construction
28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER
ECB #35685602J
CLASS - 1ACTIVE$12,5006bgk-3dad
ECB summons issuedbuilding-scoped2025-07-14
Construction
28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER
ECB #35718178H
CLASS - 1RESOLVE$6256bgk-3dad
ECB summons issuedbuilding-scoped2025-04-08
Local Law
28-302.4 FAILURE TO SUBMIT A REQUIRED REPORT OF CRITICAL EXAMINATION DOCUMENTIN
ECB #37034849P
CLASS - 2RESOLVE$1,2506bgk-3dad
DOB violation filedbuilding-scoped2025-03-21
C-CONSTRUCTION OTHER OPTIONAL
EMERGENCY WORK ORDR.OBSRVD BLDG DMGD DUE TO FIRE@ROOF LEVEL,W/WPPRX 6'X6'HOLE OVER "J"LINE W/SMALL INSPCTN HOLES@ROOF.OBSRVD SOME MODERATE CHARRNG OF ROOF JOISTS IN APT 6J.OWNR TO ENGAGE NYSPE&ENDRSD CNTCRTR TO INSTLL TEMP ROOF@ALL ROOF OPENINGS.INTSLL TEMP SHORNG@APT 6J CHARRD JOISTS
-V*-DOB VIOLATION - DISMISSED-3h2n-5cm9
DOB violation filedbuilding-scoped2025-03-20
C-CONSTRUCTION OTHER OPTIONAL
FIRE ON THE 6TH FL. OF A 6 STORY NFP BRICK AND WOOD MULTIPLE DWELLING. FIRE ORIGINATED IN APT 6J THEN SPREAD THROUGH COCK LOFT TO ADJACENT APARTMENTS 6H AND 6K ONLY. FIRE HAS OPENED 6 FT BY 6FT HOLE ABOVE J LINE OF APARTMENTS WITH JOISTS AND BEAMS CHARRED OR MISSING. APARTMENT 6J, 6K, AND 6H HAVE EXCESSIVE FIRE DAMAGE AND OPENING IN ROOFS.
-V*-DOB VIOLATION - DISMISSED-3h2n-5cm9
DOB violation filedbuilding-scoped2025-03-20
C-CONSTRUCTION OTHER OPTIONAL
FIRE ON THE 6TH FL. OF A 6 STORY NFP BRICK AND WOOD MULTIPLE DWELLING. FIRE ORIGINATED IN APT 6J THEN SPREAD THROUGH COCKLOFT TO ADJACENT APARTMENTS 6H AND 6K ONLY. FIRE HAS OPENED 6 FT BY 6FT HOLE ABOVE J LINE OF APARTMENTS WITH JOISTS AND BEAMS CHARRED OR MISSING. APARTMENT 6J, 6K, AND 6H HAVE EXCESSIVE FIRE DAMAGE AND OPENING IN ROOFS.
-V*-DOB VIOLATION - DISMISSED-3h2n-5cm9
ECB summons issuedbuilding-scoped2024-11-23
Construction
ZR 25-41 VIOLATION OF PARKING REGULATIONS IN A RESIDENTIAL DISTRICT
ECB #39131153Y
CLASS - 3RESOLVE$2506bgk-3dad
Safety context recordbuilding-scoped2024-10-11
FTC-VT-PER-CO
Violation Issued-Failure To File 2023 Periodic Inspection Affirmation of Correction
-Active-855j-jady
Safety context recordbuilding-scoped2024-09-23
LBLVIO
Violation Issued-Failure To File 2023 External Low Pressure Inspection Report
-Active-855j-jady
DOB violation filedbuilding-scoped2024-09-23
LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION
-V-DOB VIOLATION - ACTIVE-3h2n-5cm9
DOB violation filedbuilding-scoped2024-02-22
FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED
FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024
-V*-DOB VIOLATION - DISMISSED-3h2n-5cm9
Safety context recordbuilding-scoped2024-02-22
FISPNRF
FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024
-Dismissed-855j-jady

Records are the union of DOB Violations (3h2n-5cm9), ECB (6bgk-3dad), Safety Violations (855j-jady), OATH Hearings (jz4z-kudi), and OATH Trials (y3hw-z6bm) that we could link back to this BBL via BIN or address parsing. Events not tagged LL97-specific are shown as building-scoped context. See methodology · enforcement linking.

Fields we cannot show here (internal DOB data not yet public)

Processing lifecycle

DOB's internal BEAM system tracks per-building compliance stages, RCE / decarbonization plans, and mitigation credits. Those fields are not yet published as an open dataset. When DOB releases them, this product will show them here without a schema migration. Until then, the following are known gaps for this building:

  • Assessed penalty (vs theoretical)
    Actual penalty DOB assessed against a building, distinct from the theoretical over-cap exposure computed from LL84 emissions.
    Simulated · internal DOB data not yet public
    Best-effort shadow field: ecb_summons_issued
    Public release status: announced_not_yet_released
  • Audit assignment
    Buildings selected by DOB for LL97 filing audit and the audit stage.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Audit outcome
    Result of an LL97 audit (accepted / correction ordered / penalty referred).
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Extension flag
    Whether a per-building filing was accepted under a filing extension (June 30 grace or BEAM extension to August 29).
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Filing received date
    Timestamp DOB received a per-building LL97 compliance filing.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Good-faith effort application
    Whether an owner has applied for a good-faith effort determination and its status.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Mediated resolution application
    Application for the LL97 mediated resolution process and its outcome.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Notice of deficiency status
    Whether a notice of deficiency has been issued for a building and its current stage.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Per-building filing status
    Filing status for each covered BBL/BIN combination (filed / late / non-filed / exempt) as tracked in DOB's BEAM system.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Pre-OATH correspondence
    DOB correspondence with owners before an OATH matter is opened (notice of deficiency, cure letters).
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • RDP attestation
    Registered Design Professional attestation attached to each per-building compliance filing.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • RECs / offsets claimed
    Renewable Energy Credits and beneficial-use offsets claimed to reduce reported emissions.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • 60-day cure window
    The 60-day cure window state for a building under LL97 enforcement (open / cured / expired).
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
Every number on this page traces back to a Socrata dataset row or a CBL PDF revision. Where DOB does not publish a computable field (pathway, internal BEAM stage, compliance decision), we say so on the record instead of hiding the gap. See methodology.