141 PARK HILL AVENUE
CP3_article_321_one_timeCBL revision date 2026-06-16Open CBL source PDFArticle 321 · prescriptive compliance pathway
This building is on the Article 321 pathway. Article 321 does not use a numerical cap; compliance is demonstrated via the prescriptive measures package (per methodology · Article 321), which DOB does not currently publish per building. Cap, delta, and penalty columns are intentionally suppressed on Article 321 rows in this product.
LL84 GHG emissions history
Actual tCO2e reported to LL84 by report year. Each bar links to the raw LL84 row identifier under the chart for auditability.
| Year | Property type | GHG | Property GFA | Site EUI | Source EUI | ES score | Source |
|---|---|---|---|---|---|---|---|
| 2021 | Multifamily Housing | 1,817.6 tCO2e | 326,646 sqft | 97.7 | 134.2 | 38 | 7x5e-2fxh / 5998984 |
| 2022 | Multifamily Housing | 1,871.8 tCO2e | 326,646 sqft | 97.3 | 133.4 | 43 | 5zyy-y8am / 5998984 |
| 2023 | Multifamily Housing | 1,864.3 tCO2e | 326,656 sqft | 89.7 | 123.9 | 41 | 5zyy-y8am / 5998984 |
| 2024 | Multifamily Housing | - | 108,882 sqft | - | - | - | 5zyy-y8am / 54343792 |
Enforcement events (all DOB + ECB + OATH data cross-linked to this BBL)
Open on enforcement page →| Stage | Event date | Violation | Severity | Status | Penalty | Source |
|---|---|---|---|---|---|---|
| ECB summons issuedbuilding-scoped | 2026-06-15 | Construction AC 28-204.4 FAIL TO COMPLY W/COMMISSIONER ORDER TO FILE CERT OF CORRECTION W/DOB ECB #39192547X | CLASS - 2 | ACTIVE | $1,250 | 6bgk-3dad |
| ECB summons issuedbuilding-scoped | 2026-05-11 | Elevators 28-301.1 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER: SERVICE EQUIPME ECB #39188129L | CLASS - 1 | ACTIVE | $1,250 | 6bgk-3dad |
| Safety context recordbuilding-scoped | 2025-11-14 | LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | - | Active | - | 855j-jady |
| DOB violation filedbuilding-scoped | 2025-11-14 | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | - | V-DOB VIOLATION - ACTIVE | - | 3h2n-5cm9 |
| ECB summons issuedbuilding-scoped | 2025-08-30 | Construction 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER ECB #35685602J | CLASS - 1 | ACTIVE | $12,500 | 6bgk-3dad |
| ECB summons issuedbuilding-scoped | 2025-07-14 | Construction 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER ECB #35718178H | CLASS - 1 | RESOLVE | $625 | 6bgk-3dad |
| ECB summons issuedbuilding-scoped | 2025-04-08 | Local Law 28-302.4 FAILURE TO SUBMIT A REQUIRED REPORT OF CRITICAL EXAMINATION DOCUMENTIN ECB #37034849P | CLASS - 2 | RESOLVE | $1,250 | 6bgk-3dad |
| DOB violation filedbuilding-scoped | 2025-03-21 | C-CONSTRUCTION OTHER OPTIONAL EMERGENCY WORK ORDR.OBSRVD BLDG DMGD DUE TO FIRE@ROOF LEVEL,W/WPPRX 6'X6'HOLE OVER "J"LINE W/SMALL INSPCTN HOLES@ROOF.OBSRVD SOME MODERATE CHARRNG OF ROOF JOISTS IN APT 6J.OWNR TO ENGAGE NYSPE&ENDRSD CNTCRTR TO INSTLL TEMP ROOF@ALL ROOF OPENINGS.INTSLL TEMP SHORNG@APT 6J CHARRD JOISTS | - | V*-DOB VIOLATION - DISMISSED | - | 3h2n-5cm9 |
| DOB violation filedbuilding-scoped | 2025-03-20 | C-CONSTRUCTION OTHER OPTIONAL FIRE ON THE 6TH FL. OF A 6 STORY NFP BRICK AND WOOD MULTIPLE DWELLING. FIRE ORIGINATED IN APT 6J THEN SPREAD THROUGH COCK LOFT TO ADJACENT APARTMENTS 6H AND 6K ONLY. FIRE HAS OPENED 6 FT BY 6FT HOLE ABOVE J LINE OF APARTMENTS WITH JOISTS AND BEAMS CHARRED OR MISSING. APARTMENT 6J, 6K, AND 6H HAVE EXCESSIVE FIRE DAMAGE AND OPENING IN ROOFS. | - | V*-DOB VIOLATION - DISMISSED | - | 3h2n-5cm9 |
| DOB violation filedbuilding-scoped | 2025-03-20 | C-CONSTRUCTION OTHER OPTIONAL FIRE ON THE 6TH FL. OF A 6 STORY NFP BRICK AND WOOD MULTIPLE DWELLING. FIRE ORIGINATED IN APT 6J THEN SPREAD THROUGH COCKLOFT TO ADJACENT APARTMENTS 6H AND 6K ONLY. FIRE HAS OPENED 6 FT BY 6FT HOLE ABOVE J LINE OF APARTMENTS WITH JOISTS AND BEAMS CHARRED OR MISSING. APARTMENT 6J, 6K, AND 6H HAVE EXCESSIVE FIRE DAMAGE AND OPENING IN ROOFS. | - | V*-DOB VIOLATION - DISMISSED | - | 3h2n-5cm9 |
| ECB summons issuedbuilding-scoped | 2024-11-23 | Construction ZR 25-41 VIOLATION OF PARKING REGULATIONS IN A RESIDENTIAL DISTRICT ECB #39131153Y | CLASS - 3 | RESOLVE | $250 | 6bgk-3dad |
| Safety context recordbuilding-scoped | 2024-10-11 | FTC-VT-PER-CO Violation Issued-Failure To File 2023 Periodic Inspection Affirmation of Correction | - | Active | - | 855j-jady |
| Safety context recordbuilding-scoped | 2024-09-23 | LBLVIO Violation Issued-Failure To File 2023 External Low Pressure Inspection Report | - | Active | - | 855j-jady |
| DOB violation filedbuilding-scoped | 2024-09-23 | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION | - | V-DOB VIOLATION - ACTIVE | - | 3h2n-5cm9 |
| DOB violation filedbuilding-scoped | 2024-02-22 | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024 | - | V*-DOB VIOLATION - DISMISSED | - | 3h2n-5cm9 |
| Safety context recordbuilding-scoped | 2024-02-22 | FISPNRF FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024 | - | Dismissed | - | 855j-jady |
Records are the union of DOB Violations (3h2n-5cm9), ECB (6bgk-3dad), Safety Violations (855j-jady), OATH Hearings (jz4z-kudi), and OATH Trials (y3hw-z6bm) that we could link back to this BBL via BIN or address parsing. Events not tagged LL97-specific are shown as building-scoped context. See methodology · enforcement linking.
Fields we cannot show here (internal DOB data not yet public)
Processing lifecycleDOB's internal BEAM system tracks per-building compliance stages, RCE / decarbonization plans, and mitigation credits. Those fields are not yet published as an open dataset. When DOB releases them, this product will show them here without a schema migration. Until then, the following are known gaps for this building:
- Simulated · internal DOB data not yet publicAssessed penalty (vs theoretical)Actual penalty DOB assessed against a building, distinct from the theoretical over-cap exposure computed from LL84 emissions.Best-effort shadow field:
ecb_summons_issuedPublic release status: announced_not_yet_released - Simulated · internal DOB data not yet publicAudit assignmentBuildings selected by DOB for LL97 filing audit and the audit stage.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicAudit outcomeResult of an LL97 audit (accepted / correction ordered / penalty referred).Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicExtension flagWhether a per-building filing was accepted under a filing extension (June 30 grace or BEAM extension to August 29).Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicFiling received dateTimestamp DOB received a per-building LL97 compliance filing.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicGood-faith effort applicationWhether an owner has applied for a good-faith effort determination and its status.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicMediated resolution applicationApplication for the LL97 mediated resolution process and its outcome.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicNotice of deficiency statusWhether a notice of deficiency has been issued for a building and its current stage.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicPer-building filing statusFiling status for each covered BBL/BIN combination (filed / late / non-filed / exempt) as tracked in DOB's BEAM system.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicPre-OATH correspondenceDOB correspondence with owners before an OATH matter is opened (notice of deficiency, cure letters).Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicRDP attestationRegistered Design Professional attestation attached to each per-building compliance filing.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet publicRECs / offsets claimedRenewable Energy Credits and beneficial-use offsets claimed to reduce reported emissions.Public release status: announced_not_yet_released
- Simulated · internal DOB data not yet public60-day cure windowThe 60-day cure window state for a building under LL97 enforcement (open / cured / expired).Public release status: announced_not_yet_released