NYC Prototypes
Skip to main content
BBL 5039830045 · BIN 5105547 · Staten Island · Block 03983, Lot 0045

245 MILL ROAD

Article 320Pathway source: CBL PDF row · CP1_article_320_2026CBL revision date 2026-06-16Open CBL source PDF
Buildings on lot 3
← Buildings

Article 320 · numerical caps & computed exposure

How this is computed
PeriodOccupancyGFACapActualDeltaEst. penaltyStatusMethodology
2024-29R-2(high)427,749 sqft2,887.3 tCO2e1,652.5 tCO2e-1,234.8-
Under capEJ · PEJA fallback
v1.0
2030-34R-2(high)427,749 sqft1,740.9 tCO2e1,652.5 tCO2e-88.5-
Under capEJ · PEJA fallback
v1.0

Cap = Σ (occupancy_coefficient × gross_floor_area) using DOB LL97 rules; actual GHG is the most recent LL84 filing. Delta is positive when actual exceeds cap. Estimated penalty is DOB's public $268/tCO2e × delta with a 30-day grace applied via penalty_estimate_usd.

LL84 GHG emissions history

Actual tCO2e reported to LL84 by report year. Each bar links to the raw LL84 row identifier under the chart for auditability.

20211,470 tCO2e20221,498.4 tCO2e20231,546.8 tCO2e20241,652.5 tCO2e
YearProperty typeGHGProperty GFASite EUISource EUIES scoreSource
2021Multifamily Housing1,470 tCO2e366,642 sqft68.1100.6797x5e-2fxh / 15923275
2022Multifamily Housing1,498.4 tCO2e366,642 sqft66.898.6835zyy-y8am / 15923275
2023Multifamily Housing1,546.8 tCO2e427,749 sqft54.079.2895zyy-y8am / 15923275
2024Multifamily Housing1,652.5 tCO2e427,749 sqft57.582.9895zyy-y8am / 15923275

Enforcement events (all DOB + ECB + OATH data cross-linked to this BBL)

Open on enforcement page →
0 LL97-specific events · 8 building-scoped context events.
DOB violation filed0 LL97 · 3 scoped
ECB summons issued0 LL97 · 3 scoped
Safety context record0 LL97 · 2 scoped
StageEvent dateViolationSeverityStatusPenaltySource
DOB violation filedbuilding-scoped2024-06-17
C-CONSTRUCTION OTHER OPTIONAL
EMERGENCY WORK ORDER DUE TO A BROKEN FIRE ESCAPE RAILING AT A CONNECTI ON POINT ON THE 3RD FLOOR Q LINE OF EXP1 SOUTH ELEV.ALSO CRACKED/SPALL ED BRICK MASONRY AT A FIRE ESCAPE ANCHORING POINT ON THE 6TH FLOOR OF EXP3 NORTH ELEV.REMEDY:IMMEDIATELY PROVIDE SAFETY MEASURES TO SECURE A ND PROTECT THE PUBLIC.MAKE REPAIRS UNDER SUPERVISION OF LIC PROF
-V*-DOB VIOLATION - DISMISSED-3h2n-5cm9
ECB summons issuedbuilding-scoped2024-06-17
Construction
28-302.1 FAILURE TO MAINTAIN BLDG WALL(S) OR APPURTENANCES
ECB #35685576P
CLASS - 1RESOLVE$2,5006bgk-3dad
ECB summons issuedbuilding-scoped2024-03-19
Construction
28-105.1 WORK WITHOUT A PERMIT
ECB #35670945J
CLASS - 2ACTIVE$1,2506bgk-3dad
ECB summons issuedbuilding-scoped2024-03-19
Construction
BC 3307.3.1,27-102(A) FAILURE TO PROVIDE SIDEWALK SHED WHERE REQUIRED
ECB #35670944H
CLASS - 1RESOLVE$10,0006bgk-3dad
Safety context recordbuilding-scoped2024-02-17
FISPHAZ
CYCLE 9C UNSAFE REPORT FILED
-Dismissed-855j-jady
DOB violation filedbuilding-scoped2024-02-17
FISPHAZ-HAZARDOUS CONDITION (FACADE) FACADE REQUIRED
CYCLE 9C UNSAFE REPORT FILED
-V*-DOB VIOLATION - DISMISSED-3h2n-5cm9
Safety context recordbuilding-scoped2024-02-17
FISPHAZ
CYCLE 9C UNSAFE REPORT FILED
-Dismissed-855j-jady
DOB violation filedbuilding-scoped2024-02-17
FISPHAZ-HAZARDOUS CONDITION (FACADE) FACADE REQUIRED
CYCLE 9C UNSAFE REPORT FILED
-V*-DOB VIOLATION - DISMISSED-3h2n-5cm9

Records are the union of DOB Violations (3h2n-5cm9), ECB (6bgk-3dad), Safety Violations (855j-jady), OATH Hearings (jz4z-kudi), and OATH Trials (y3hw-z6bm) that we could link back to this BBL via BIN or address parsing. Events not tagged LL97-specific are shown as building-scoped context. See methodology · enforcement linking.

Fields we cannot show here (internal DOB data not yet public)

Processing lifecycle

DOB's internal BEAM system tracks per-building compliance stages, RCE / decarbonization plans, and mitigation credits. Those fields are not yet published as an open dataset. When DOB releases them, this product will show them here without a schema migration. Until then, the following are known gaps for this building:

  • Assessed penalty (vs theoretical)
    Actual penalty DOB assessed against a building, distinct from the theoretical over-cap exposure computed from LL84 emissions.
    Simulated · internal DOB data not yet public
    Best-effort shadow field: ecb_summons_issued
    Public release status: announced_not_yet_released
  • Audit assignment
    Buildings selected by DOB for LL97 filing audit and the audit stage.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Audit outcome
    Result of an LL97 audit (accepted / correction ordered / penalty referred).
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Extension flag
    Whether a per-building filing was accepted under a filing extension (June 30 grace or BEAM extension to August 29).
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Filing received date
    Timestamp DOB received a per-building LL97 compliance filing.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Good-faith effort application
    Whether an owner has applied for a good-faith effort determination and its status.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Mediated resolution application
    Application for the LL97 mediated resolution process and its outcome.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Notice of deficiency status
    Whether a notice of deficiency has been issued for a building and its current stage.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Per-building filing status
    Filing status for each covered BBL/BIN combination (filed / late / non-filed / exempt) as tracked in DOB's BEAM system.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • Pre-OATH correspondence
    DOB correspondence with owners before an OATH matter is opened (notice of deficiency, cure letters).
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • RDP attestation
    Registered Design Professional attestation attached to each per-building compliance filing.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • RECs / offsets claimed
    Renewable Energy Credits and beneficial-use offsets claimed to reduce reported emissions.
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
  • 60-day cure window
    The 60-day cure window state for a building under LL97 enforcement (open / cured / expired).
    Simulated · internal DOB data not yet public
    Public release status: announced_not_yet_released
Every number on this page traces back to a Socrata dataset row or a CBL PDF revision. Where DOB does not publish a computable field (pathway, internal BEAM stage, compliance decision), we say so on the record instead of hiding the gap. See methodology.